Side-by-side research view

Compare names across metrics and research quality

Use up to 4 U.S.-listed names from this dashboard to compare valuation, growth, cash flow, balance-sheet strength, and the curated investment case in one place.

1 stocks in current compare
4 max names side by side
25 shared metrics lined up

Build a compare set

Enter comma-separated tickers from the dashboard universe. Duplicate tickers are ignored automatically.

Clear
ETN Power, Cooling & Grid

Eaton

Grid-to-rack power equipment

Detail page

AI data centers need more switchgear, power distribution, and electrical infrastructure, which plays directly into Eaton's strengths.

Price $448.68
1D change +0.11%
Market cap $174.22B
Sector Industrials

Shared metric table

Live market metrics plus reported quarterly revenue and profit QoQ rows.

Green and red only apply where direction is meaningful. Quarterly revenue and profit cells inherit the sign of the reported QoQ change, which can swing sharply when the prior quarter included a one-time item.

On smaller screens, swipe this table horizontally to compare the full set.

Metric ETN
Price $448.68
1D Change +0.11%
Market Cap $174.22B
Enterprise Value $194.94B
Trailing P/E 45.6
Forward P/E 28.0
PEG Ratio 3.22x
Price / Sales 5.8
EV / Revenue 6.5
Revenue Growth 21.4%
Earnings Growth -15.9%
Gross Margin 36.0%
Operating Margin 16.6%
Net Margin 12.8%
ROE 19.7%
Free Cash Flow $3.11B
FCF Margin 10.3%
Debt / Equity 1.05x
Current Ratio 1.24x
Dividend Yield 0.98%
Next Earnings Nov 03, 2026
Quarterly Revenue $nan
Revenue QoQ nan%
Quarterly Net Income $nan
Net Income QoQ nan%

ETN thesis lens

Grid-to-rack power equipment

Why it could benefit

  • AI data centers need more switchgear, power distribution, and electrical infrastructure, which plays directly into Eaton's strengths.
  • It benefits from AI even if the winning compute vendor changes.
  • This is one of the cleaner ways to own the physical buildout side of the boom.

Moat / edge

  • Longstanding position in electrical equipment and distribution.
  • Trusted supplier relationships in critical infrastructure.
  • Breadth across the power chain.

What to watch

  • Data-center order growth and backlog.
  • Margin durability as demand stays hot.
  • How much AI spending flows into low-voltage and medium-voltage equipment.

Key risks

  • A project-driven business can be influenced by timing and mix.
  • Any pause in data-center construction can slow growth.