AI data centers need more switchgear, power distribution, and electrical infrastructure, which plays directly into Eaton's strengths.
Side-by-side research view
Compare names across metrics and research quality
Use up to 4 U.S.-listed names from this dashboard to compare valuation, growth, cash flow, balance-sheet strength, and the curated investment case in one place.
1 stocks in current compare
4 max names side by side
25 shared metrics lined up
Build a compare set
Enter comma-separated tickers from the dashboard universe. Duplicate tickers are ignored automatically.
Price
$341.72
1D change
+4.50%
Market cap
$132.76B
Sector
Industrials
| Metric | ETN |
|---|---|
| Price | $341.72 |
| 1D Change | +4.50% |
| Market Cap | $132.76B |
| Enterprise Value | $152.91B |
| Trailing P/E | 34.1 |
| Forward P/E | 20.9 |
| PEG Ratio | 1.83x |
| Price / Sales | 4.2 |
| EV / Revenue | 4.8 |
| Revenue Growth | 28.0% |
| Earnings Growth | 7.0% |
| Gross Margin | 35.2% |
| Operating Margin | 17.8% |
| Net Margin | 12.2% |
| ROE | 19.5% |
| Free Cash Flow | $3.03B |
| FCF Margin | 9.5% |
| Debt / Equity | 1.00x |
| Current Ratio | 1.23x |
| Dividend Yield | 1.29% |
| Next Earnings | Feb 02, 2027 |
| Quarterly Revenue | $8.95B |
| Revenue QoQ | nan% |
| Quarterly Net Income | $1.08B |
| Net Income QoQ | nan% |
ETN thesis lens
Grid-to-rack power equipment
Why it could benefit
- AI data centers need more switchgear, power distribution, and electrical infrastructure, which plays directly into Eaton's strengths.
- It benefits from AI even if the winning compute vendor changes.
- This is one of the cleaner ways to own the physical buildout side of the boom.
Moat / edge
- Longstanding position in electrical equipment and distribution.
- Trusted supplier relationships in critical infrastructure.
- Breadth across the power chain.
What to watch
- Data-center order growth and backlog.
- Margin durability as demand stays hot.
- How much AI spending flows into low-voltage and medium-voltage equipment.
Key risks
- A project-driven business can be influenced by timing and mix.
- Any pause in data-center construction can slow growth.