AI data centers need more switchgear, power distribution, and electrical infrastructure, which plays directly into Eaton's strengths.
Side-by-side research view
Compare names across metrics and research quality
Use up to 4 U.S.-listed names from this dashboard to compare valuation, growth, cash flow, balance-sheet strength, and the curated investment case in one place.
1 stocks in current compare
4 max names side by side
25 shared metrics lined up
Build a compare set
Enter comma-separated tickers from the dashboard universe. Duplicate tickers are ignored automatically.
Price
$448.68
1D change
+0.11%
Market cap
$174.22B
Sector
Industrials
| Metric | ETN |
|---|---|
| Price | $448.68 |
| 1D Change | +0.11% |
| Market Cap | $174.22B |
| Enterprise Value | $194.94B |
| Trailing P/E | 45.6 |
| Forward P/E | 28.0 |
| PEG Ratio | 3.22x |
| Price / Sales | 5.8 |
| EV / Revenue | 6.5 |
| Revenue Growth | 21.4% |
| Earnings Growth | -15.9% |
| Gross Margin | 36.0% |
| Operating Margin | 16.6% |
| Net Margin | 12.8% |
| ROE | 19.7% |
| Free Cash Flow | $3.11B |
| FCF Margin | 10.3% |
| Debt / Equity | 1.05x |
| Current Ratio | 1.24x |
| Dividend Yield | 0.98% |
| Next Earnings | Nov 03, 2026 |
| Quarterly Revenue | $nan |
| Revenue QoQ | nan% |
| Quarterly Net Income | $nan |
| Net Income QoQ | nan% |
ETN thesis lens
Grid-to-rack power equipment
Why it could benefit
- AI data centers need more switchgear, power distribution, and electrical infrastructure, which plays directly into Eaton's strengths.
- It benefits from AI even if the winning compute vendor changes.
- This is one of the cleaner ways to own the physical buildout side of the boom.
Moat / edge
- Longstanding position in electrical equipment and distribution.
- Trusted supplier relationships in critical infrastructure.
- Breadth across the power chain.
What to watch
- Data-center order growth and backlog.
- Margin durability as demand stays hot.
- How much AI spending flows into low-voltage and medium-voltage equipment.
Key risks
- A project-driven business can be influenced by timing and mix.
- Any pause in data-center construction can slow growth.